Hardware, sized to your business case.

We start from what you need AI to do and the budget you have, then size the system, source it through authorized distribution channels and commission it so it is productive on handover. One contract covers delivery, installation and warranty.

Why own the hardware.

Renting tokens is the fastest way to start. Owning makes sense once the volume and the data justify it.

Lower cost at steady volume

When usage is high and constant, owned capacity usually costs less per token than renting. We model the break-even for you.

Control of sensitive data

Prompts, documents and outputs never leave systems you operate, which simplifies risk and compliance reviews.

Capacity you can allocate

Share one cluster across teams and projects, and choose which models run on it.

Not sure whether to buy or rent? See ways to buy.

Data centre GPU servers

Air- and liquid-cooled multi-GPU servers for training, fine-tuning and high-volume inference.

Workstations

Desktop and rack workstations for model development, simulation and visual computing teams.

Edge and embedded

Compact systems for factories, vehicles, hospitals and sites with limited power and no data centre.

Networking and storage

High-speed fabrics and parallel storage sized so the GPUs are never waiting for data.

Typical engagements

ScaleTypical useWhat we deliver
Single nodePilot, department assistant, private fine-tuningOne GPU server or workstation, installed, configured and benchmarked on your models
RackProduction inference for one organizationServers, switching and storage in one rack, with power and cooling plan and serving software
Multi-rack podEnterprise AI platformPod design, phased procurement, facility coordination, commissioning and operator training

From sizing to lifecycle.

Every engagement covers the same four stages, so nothing is left for you to discover after the hardware arrives.

Sizing

From tokens per day, model size and latency targets to GPU count, memory, interconnect, storage and power draw.

Sourcing

Systems and components procured through authorized distribution channels, with lead times confirmed before you commit.

Integration

Rack, power and cooling planning with your facilities team, then installation, burn-in and the software stack.

Lifecycle

Warranty handling, spares, firmware and driver updates, and a path to expand the cluster as demand grows.

Is your facility ready?

The four questions that decide whether a system can be installed on your timeline. We help you answer them.

Power

Available kilowatts per rack, redundancy and the electrical work needed to connect.

Cooling

Whether air is enough or the room needs liquid cooling, and what that changes.

Space and weight

Rack positions, floor loading and access for delivery.

Network

Uplinks, switching and the security zone the system will sit in.

Reference configurations.

Typical building blocks we quote. Final configuration, memory, networking and storage are specified per order.

ConfigurationGPUsTotal GPU memoryTypical use
HGX H200 server8 x H200 SXM1,128 GB HBM3eLarge-model inference, fine-tuning
HGX B200 server8 x B200 SXM1,440 GB HBM3eHigh-throughput serving and training
HGX B300 server8 x B300 SXMAbout 2.1 TB HBM3eFrontier-scale models, long context
RTX PRO serverUp to 8 x RTX PRO 6000 BlackwellUp to 768 GB GDDR7Private inference, rendering, virtual workstations
Developer workstation1 to 2 x RTX PRO 5000 or 600048 to 192 GB GDDR7Model development, visualisation

Planning your facility.

Power and cooling decide what you can install and when. These are indicative maximums for planning, and we confirm figures against the vendor datasheet for your exact configuration.

SystemIndicative maximum powerCooling
8-GPU Hopper server (H100, H200)Up to about 10 kW per serverAir-cooled
8-GPU Blackwell server (B200)Up to about 14 kW per serverAir-cooled or direct liquid cooling
RTX PRO 6000 Server EditionUp to 600 W per GPU, plus CPUs and fansAir-cooled, passive cards need server airflow

A single 8-GPU server can draw more than a conventional rack of enterprise servers. Most existing colocation contracts and room circuits need upgrading before installation, which is why we start with the facility.

What every quote includes.

So you can compare us with any other supplier on equal terms.

Bill of materials

Every component with manufacturer part numbers, quantities and software licences.

Price and validity

Itemised pricing in your currency, with the period the price holds.

Lead time and delivery

Confirmed lead times from our distributors, delivery terms and who carries the freight and import duties.

Warranty and support

Manufacturer warranty terms and the support options available for your site.

Facility requirements

Power, cooling, weight, rack space and network needs, written down before you commit.

Installation and acceptance

The installation plan and the tests that must pass before handover.

Describe the system you have in mind.

Even a rough workload is enough for a first configuration and lead-time estimate.